e世博esball的愿景揭晓:e世博esball南校区停车的未来
Xavier University is in the beginning stages of the development of our cutting-edge multi-storey 停车 garage at Xavier South. Witness the transformation of or urban landscapes as we redefine convenience, 效率, 社会和谐.
This innovative structure isn't just about 停车 – it's a solution designed to alleviate street traffic and 停车 challenges. Picture a seamlessly integrated system that not only optimizes space but also minimizes disruptions to our valued neighbors.
社区更新
2024年3月20日
On April 1st, 2024, we will begin moving cranes and heavy loads on campus at the construction site. 在这些活动中,安全是最重要的, and we urge everyone to remain vigilant and adhere to safety protocols at all times. Signage has been placed throughout the construction site to alert you to potential hazards. Please respect these warnings and exercise caution when near construction areas. Please refrain from walking or driving through the construction site as trucks move in and out, 因为它带来了风险. Additionally, please stay informed about any street closures or detours related to the construction. 我们感谢您的耐心,因为我们正在努力改善校园设施. 你们在优先考虑安全方面的合作至关重要. 如果您有任何问题或疑虑, 请不要犹豫,通过建设info@XULA与我们联系.或1-504-520-3200感谢您的理解和支持.
2024年2月20日
为兴建停车库而封闭迪西昂街公告
虽然我们认识到这可能会带来一些不便, please understand that this measure is essential for the advancement of the construction project. For a detailed understanding of the affected area, please refer to the attached map.
如果您有任何问题或疑虑, do not hesitate to reach out to me at constructioninfo@XULA.edu 或致电504-520-7395.
We appreciate your understanding and cooperation during this construction phase. Your safety and the successful completion of this project is our top priorities.
2024年2月6日
F停车场部分停车场关闭
从本周五开始, 2月9日, the first three lanes within Parking Lot F will be closed off until the summer. This closure is necessary to facilitate construction work in the vicinity. As a result, those three lanes will be unavailable for use from 2月9日 onwards.
确保安全,有效管理施工区域, 在指定的禁区周围将设置围栏. Please be mindful of this fencing and cooperate with any additional instructions or signage that may be in place.
如果你对这个建设项目有任何疑问, 噪音水平, 或相关事宜, 请随时联系我 constructioninfo@XULA.edu 或致电504-520-7395.
10/26
- 经批准的发展社区会议的机构总体规划ting. ( 会议附属大楼111室,位于华盛顿大道7800号. 新奥尔良,La 70125, 10月26日下午)
10/7周
- Multivista将执行最后的内部调查.
10/2周
- Multivista will complete the second round of photo documenting property interiors as requested by neighbors.
- Multivista will hand-deliver letters one last time for request of interior surveys.
9/25周
- Multivista will perform a second round of photo documenting property interiors as requested by neighbors.
9/18周
- Multivista将再次为邻居们手工送信.
- Multivista will complete the first round of photo documenting property interiors as requested by neighbors.
- Dixon & (部分)南克拉克街封闭视觉辅助设备
9/11周:
- Multivista will perform the first round of photo documenting property interiors as requested by neighbors.
- Multivista将继续进行外部调查.
9/4周:
- Lemoine/Multivista will hand-deliver letters to residence and begin taking calls.
- Multivista will begin photo documenting the exteriors of Xavier’s buildings and surrounding neighborhood.